Bridgnorth Fencing

We were invited to repair eleven speartop panels for the terrace to be built alongside the new restaurant at Bridgnorth.

The fencing was cut down at Trowbridge leaving the end posts in the ground. We have made new end posts and stays, and will weld extension pieces to the top and bottom rails to replace material lost during removal.

A gate will also need to be made using original 'spears' and a new frame.

This project will save about £8,000 against the cost of replica fencing – a decent contribution to the Bridgnorth project !

Backing Signal Back BACK
BRIDGNORTH FENCING See Progress in
Magazine:
Latest Projects
Oct 2016